PROJECT DESCRIPTION :
With the construction of this facility, the amount of arsenic in the water has been brought to the world health standards. The largest drinking water arsenic treatment plant in the world was installed in Izmir with a capacity of 3,000 lt / sec (270,000 m3 / day) and all electrical and automation works of this facility were carried out by our company.
In project scope;
- Supply of 34.5 kV MV power transmission line,
- 2000 kVA Transformer, main distribution and compensation panel manufacturing,
- Supply and commissioning of 3.700 kVA diesel generators and synchronization panels,
- 11 pcs 110 kW pump soft starter board,
- Power panel of 32 filter groups, each consisting of 4 filter tanks,
- Power panel of physical and chemical treatment plant of backwash water,
- Illumination of facility buildings and its surroundings,
- Establishment of lightning protection and grounding system
- Promotion Center, Establishment of FO communication system between warehouses and treatment plant.
- The system has been automated with PLC and SCADA.